MIL-PRF-19500/464G
* 4.4.3 Group C inspection. Group C inspection shall be conducted in accordance with the conditions specified for
subgroup testing in table E-VII of MIL-PRF-19500 and as follows. Electrical measurements (end-points) shall be in
accordance with the table I, subgroup 2 herein.
Method
Conditions
Subgroup
C2
2036
Test condition A, weight = 10 pounds, t = 15 s.
See 4.3.2, RθJC = .584°C/W.
C5
3131
6,000 cycles, VCE ≥ 10 V dc, ĆTJ between cycles ≥ +100°C, adjust power or
C6
1037
current to achieve a ĆTJ = +100°C.
* 4.4.4 Group E inspection. Group E inspection shall be conducted in accordance with the conditions specified for
subgroup testing in table E-IX of MIL-PRF-19500 and as specified herein. Electrical measurements (end-points) shall
be in accordance with the table I, subgroup 2 herein.
4.5 Method of inspection. Methods of inspection shall be as specified in the appropriate tables and as follows.
4.5.1 Pulse measurements. Conditions for pulse measurement shall be as specified in section 4 of
MIL-STD-750.
6
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business