MIL-PRF-19500/102B
TABLE II. Group E inspection (all quality levels) - for qualification only.
Inspection
Qualification
Method
Conditions
Subgroup 1
45 devices
c=0
Temperature cycling
1051
Test condition C, 500 cycles.
(air to air)
Hermetic seal
1071
Fine leak
Gross leak
See table I, subgroup 2 herein.
Electrical measurements
Subgroup 2
45 devices
c=0
1026
Steady-state operating life
VCB = 30 V dc, 6,000 cycles. Adjust device current, or
power, to achieve a minimum ĆTJ of 100°C.
Electrical measurements
See table I, subgroup 2 herein.
Subgroup 4
Sample size
N/A
3131
Thermal impedance
See MIL-PRF-19500, table E-IX, group E, subgroup 4.
curves
Subgroup 5
Not applicable
Subgroup 8
45 devices
c=0
Reverse stability
1033
Condition B.
8
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business