MIL-PRF-19500/622D
4.4 Conformance inspection. Conformance inspection shall be in accordance with MIL-PRF-19500, and as
specified herein.
4.4.1 Group A inspection. Group A inspection shall be conducted in accordance with table E-V of
MIL-PRF-19500, and table I herein.
4.4.2 Group B inspection. Group B inspection shall be conducted in accordance with the conditions specified for
subgroup testing in tables E-VIa and E-VIb of MIL-PRF-19500. Electrical measurements (end-points) shall be in
accordance with table I, subgroup 2 herein.
*
4.4.2.1 Group B inspection table E-VIa (JANS) of MIL-PRF-19500.
Subgroup
Method
Conditions
VCB ≥ 10 V dc.
*
B4
1037
*
B5
2037
Bond strength, test condition D.
B6
3131
See 4.5.2.
*
4.4.2.2 Group B inspection, table E-VIb (JAN, JANTX, and JANTXV) of MIL-PRF-19500.
Subgroup
Method
Conditions
VCB ≥ 10 V dc.
B3
1037
*
B5
3131
See 4.5.2.
TA = +200°C.
B6
1032
* 4.4.3 Group C inspection. Group C inspection shall be conducted in accordance with the conditions specified for
subgroup testing in table E-VII of MIL-PRF-19500. Electrical measurements (end-points) shall be in accordance with
table I, subgroup 2 herein.
Subgroup
Method
Conditions
C2
1056
Test condition B.
C2
2036
Test condition A, weight = 4.5 kg, t = 10 seconds.
VCB ≥ 10 V dc.
*
C6
1037
6
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business