MIL-PRF-19500/168K
4.4.3 Group C inspection. Group C inspection shall be conducted in accordance with the conditions specified for
subgroup testing in table E-VII of MIL-PRF-19500. Electrical measurements (end-points) shall be in accordance with
the applicable steps of table II herein.
* 4.4.3.1 Group C inspection, table E-VII of MIL-PRF-19500.
Subgroup
Method
Condition
C2
2036
Test condition A, weight 10 pounds, application time = 15 seconds.
C3
Not applicable.
TC = +118°C, ±5°C, 50 min "on", IO = 1.25 A, TC uncontrolled, 10 minutes "off".
C6
1026
4.4.4 Group E inspection. Group E inspection shall be conducted in accordance with the tests and conditions
specified for subgroup testing in table E-IX of MIL-PRF-19500, and table III herein. Electrical measurements (end-
points) shall be in accordance with table I, subgroup 2 herein.
4.5 Methods of inspection. Methods of inspection shall be as specified in the appropriate tables and as follows.
4.5.1 Pulse measurements. Conditions for pulse measurement shall be as specified in section 4 of MIL-STD-750.
6
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business