MIL-PRF-19500/566C
* 4.4.2.1 Group B inspection, table E-VIA (JANS) of MIL-PRF-19500.
Subgroup
Method
Conditions
*
B3
1051
Test condition G
*
B3
2075
See 3.4.2.
B4
1042
Test condition D, 2,000 cycles minimum, the heating cycle shall be 1 minute
minimum.
*
B5
1042
minimum, read and record VBR(DSS) (pre and post) at ID = 1 mA, read and record
*
B5
1042
minimum.
4.4.2.2 Group B inspection, table E-VIB (JAN, JANTX and JANTXV) of MIL-PRF-19500.
Subgroup
Method
Conditions
*
B2
1051
Test condition G
B3
1042
Test condition D; 2,000 cycles minimum. The heating cycle shall be 1 minute
minimum.
*
B4
2075
See 3.4.2.
* 4.4.3 Group C inspection. Group C inspection shall be conducted in accordance with the conditions specified for
subgroup testing in table E-VII of MIL-PRF-19500. End-point electrical and delta measurements shall be in
accordance with table I, subgroup 2 herein.
Subgroup
Method
Conditions
*
C2
2036
Test condition A; weight = 10 lbs., t = 15 s.
*
C5
3161
See 4.3.3.
C6
1042
Test condition D; 6,000 cycles minimum. The heating cycle shall be 1 minute
minimum.
* 4.4.4 Group E inspection. Group E inspection shall be conducted in accordance with the conditions specified for
subgroup testing in table E-IX of MIL-PRF-19500 and as specified in table II herein. Electrical measurements (end-
points) shall be in accordance with table I, subgroup 2 herein.
4.5 Methods of inspection. Methods of inspection shall be as specified in the appropriate tables and as follows.
4.5.1 Pulse measurements. Conditions for pulse measurement shall be as specified in section 4 of MIL-STD-750.
9
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business