MIL-PRF-19500/623D
* TABLE II. Group E inspection (all quality levels) - for qualification or re-qualification only.
Qualification
Inspection
Method
Conditions
Subgroup 1
45 devices
c=0
Temperature cycling
1051
500 cycles.
(air to air)
Hermetic seal
1071
*
Fine leak
Gross leak
Electrical measurements
See table I, subgroup 2 herein.
Subgroup 2
45 devices
c=0
High temperature
1039
Condition A; 1,000 hours.
reverse bias
Electrical measurements
See table I, subgroup 2 herein.
Subgroup 4
Thermal impedance
curves
Subgroup 5
Not applicable
Subgroup 6
11 devices
*
c=0
1020
Electrostatic discharge
(ESD)
Subgroup 8
45 devices
c=0
Condition A for devices ≥ 400 V, condition B for
Reverse stability
1033
devices < 400 V.
9
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business