MIL-PRF-19500P
APPENDIX E
PRODUCTION
JAN
PROCESS
CONFORMANCE
INSPECTION LOTS
LOTS
1. RAW MATERIAL
INSPECTION
PROPOSED
FORMED AFTER
2. FACTORY PROCESS
FOR JAN
FINAL ASSEMBLY
3. INTERNAL VISUAL AS
GROUP A
OPERATION
SPECIFIED IN THE
TYPES
GROUP B
SPECIFICATION
(SEALING)
GROUP C
SHEET (FOR TXV
ONLY)
REVIEW OF
GROUPS
ALL SPECIFIED TABLE
LOT PROPOSED
A, B, AND C
E-IV 100-PERCENT
FOR JANTX OR
SCREENS FOR JANTX,
DATA FOR
JANTXV TYPES
JANTXV AS
ACCEPT OR
APPLICABLE
REJECT
SEE NOTE 2
CONFORMANCE
REVIEW OF
JAN
INSPECTION TESTS
GROUPS A, B, AND
PREPARATION
C, (D, IF
FOR DELIVERY
GROUP A
APPLICABLE) SEE
GROUP B
NOTE 3
GROUP C
GROUP D
DATA FOR LOT
ACCEPT OR REJECT
SEE NOTE 3, IF
APPLICABLE
JANTX OR JANTXV
PREPARATION FOR
DELIVERY
NOTES:
1. All products to be proposed for JANTXV processing shall have been subjected to and passed JANTXV
internal visual 100-percent screening at this step (except for clear glass JANTXV diodes which shall be
subjected to internal visual inspection prior to painting and marking).
2. Order of the tests shall be performed as specified in table E-IV.
3. Group D inspection may be performed at any point prior to lot formation.
FIGURE E-1. Order of procedure diagram for JAN, JANTX, and JANTXV device types.
90
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business