MIL-PRF-19500P
APPENDIX E
PRODUCTION PROCESS
1.
RAW MATERIAL
INTERNAL VISUAL
2.
FACTORY PROCESSING
INSPECTION (PRE-CAP)
100-PERCENT
3.
PROCESS CONTROLS
4.
WAFER LOT INSPECTION
5.
SEM. (AS APPLICABLE)
LOTS FORMED AFTER FINAL
LOTS PROPOSED FOR JANS
ASSEMBLY OPERATION
TYPES
(SEALING)
CONFORMANCE INSPECTION
1. ISSUE LOT QUANTITIES
TEST (SEE NOTE)
2. 100-PERCENT SCREENING
TESTS AS SPECIFIED IN
GROUP A
ALL LOTS
TABLE E-IV
3. LOT REJECTION CRITERIA
GROUP B
ALL LOTS
BASED ON REJECTS FROM
BURN-IN TEST (PDA)
GROUP C
4. OTHER TESTS AS
SPECIFIED IN
GROUP D
SPECIFICATION SHEET
5. SEM (AS APPLICABLE)
REVIEW OF GROUPS A, B, C,
AND D DATA FOR LOTS
JANS PREPARATION FOR
ACCEPT OR REJECT
DELIVERY
NOTE: Group D testing may be performed at any point following the production process (see E.6.5).
FIGURE E-3. Order of procedure diagram for JANS.
92
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business