MIL-PRF-19500/394N
* TABLE I. Group A inspection - Continued.
Inspection 1/
Limit
Unit
Symbol
Method
Conditions
Min
Max
Subgroup 5 - Continued.
TC = +100°C minimum,
Clamped inductive sweep
3053
IB = 0.5 A dc, IC = 5 A dc,
(see figure 10)
Electrical measurements
See 4.5.2 herein.
1/ For sampling plan see MIL-PRF-19500.
2/ For resubmission of failed test in subgroup 1 of table I, double the sample size of the failed test or sequence of
tests. A failure in table I, subgroup 1 shall not require retest of the entire subgroup. Only the failed test shall be
rerun upon submission.
3/ Separate samples may be used.
4/ Not required for JANS devices.
5/ Not required for laser marked devices.
6/ This hermetic seal test is an end-point to temp-cycling in addition to electrical measurements.
14
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business