MIL-PRF-19500/501E
* 4.4.3 Group C inspection. Group C inspection shall be conducted in accordance with the conditions specified for
subgroup testing in appendix E, table E-VII of MIL-PRF-19500. Electrical measurements (end-points) shall be in
accordance with table I, subgroup 2 herein and delta measurements shall be in accordance with table II herein.
4.4.3.1. Group C inspection, appendix E, table E-VII of MIL-PRF-19500.
Subgroup
Method
Conditions
C2
2036
Test condition A, weight = 10 pounds, t = 15 s.
C5
3131
VCB ≥ 10 V dc, ĆTJ between cycles ≥ +100°C, ton = toff = 3 minutes for 6,000
C6
1037
cycles. No heat sink or forced-air cooling on the devices shall be permitted.
4.4.4 Group E inspection. Group E inspection shall be conducted in accordance with the conditions specified for
subgroup testing in table E-IX of MIL-PRF-19500 and as specified herein. Electrical measurements (end-points)
shall be in accordance with table I, subgroup 2 herein. Delta measurements shall be in accordance with table II
herein and applies to subgroup E1 and E2.
4.5 Method of inspection. Methods of inspection shall be as specified in the appropriate tables and as follows.
4.5.1 Pulse measurements. Conditions for pulse measurement shall be as specified in section 4 of
7
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business