4.4 Conformance inspection. Conformance inspection shall be in accordance with MIL-PRF-19500 and as
specified herein. If alternate screening is being performed in accordance with MIL-PRF-19500, a sample of screened
devices shall be submitted to and pass the requirements of subgroups 1 and 2 of table I herein, inspection only (table
E-VIb, group B, subgroup 1 is not required to be performed since solderability and resistance to solvents testing is
performed in table I, subgroup 1 herein.
4.4.1 Group A inspection. Group A inspection shall be conducted in accordance with MIL-PRF-19500,
and table I.
4.4.2 Group B inspection. Group B inspection shall be conducted in accordance with the tests and conditions
specified for subgroup testing in table E-Via (JANS) of MIL-PRF-19500 and 4.4.2.1. Electrical measurements (end-
points) requirements shall be in accordance with table I, subgroup 2. Delta requirements shall be in accordance with
4.5.2, delta requirements only apply to subgroups B4 and B5. See 4.4.2.2 for JAN, JANTX, and JANTXV group B
testing. Electrical measurements (end-points) for JAN, JANTX, and JANTXV shall be in accordance with group A,
subgroup 2. Delta requirements shall be in accordance with 4.5.2 and shall be after each step in 4.4.2.2.
4.4.2.1 Group B inspection (JANS), table E-VIa of MIL-PRF-19500.
Subgroup Method
Condition
VCB = 10 V dc, 2,000 cycles, adjust device current, or power, to achieve a minimum ĆTJ of
B4
1037
+100°C.
B5
1027
occurs, resubmission shall be at the test conditions of the original sample.)
Option 1: 96 hours minimum sample size in accordance with MIL-PRF-19500, table E-VIa,
adjust TA or PD to achieve TJ = +275°C minimum.
Option 2: 216 hours minimum, sample size = 45, c = 0; adjust TA or PD to achieve a
TJ = +225°C minimum.
4.4.2.2 Group B inspection, (JAN, JANTX, and JANTXV). Separate samples may be used for each step. In the
event of a lot failure, the resubmission requirements of MIL-PRF-19500 shall apply. In addition, all catastrophic
failures during CI shall be analyzed to the extent possible to identify root cause and corrective action. Whenever a
failure is identified as wafer lot or wafer processing related, the entire wafer lot and related devices assembled from
the wafer lot shall be rejected unless an appropriate determined corrective action to eliminate the failures mode has
been implemented and the devices from the wafer lot are screened to eliminate the failure mode.
Step
Method
Condition
Steady-state life: 1,000 hours minimum, VCB = 10 V dc, power shall be applied to achieve
1
1026
TJ = +150°C minimum using a minimum of PD = 75 percent of maximum rated PT as
defined in 1.3. n = 45 devices, c = 0. The sample size may be increased and the test time
decreased as long as the devices are stressed for a total of 45,000 device hours minimum,
and the actual time of test is at least 340 hours.
Blocking life, TA = +150°C, VCB = 80 percent of rated voltage, 48 hours minimum.
2
1048
n = 45 devices, c = 0.
High-temperature life (non-operating), t = 340 hours, TA = +200°C. n = 22, c = 0.
3
1032
11
For Parts Inquires call Parts Hangar, Inc (727) 493-0744