MIL-PRF-19500/544H
4.4.2.1 Group B inspection (JANS) table E-VIA of MIL-PRF-19500.
Subgroup
Method
Conditions
B4
1037
VCB = 10 V dc.
B5
1027
occurs, resubmission shall be at the test conditions of the original sample.)
Option 1: 96 hours minimum sample size in accordance with MIL-PRF-19500,
table E-VIA, adjust TA or PD to achieve TJ = +275°C minimum.
Option 2: 216 hours minimum, sample size = 45, c = 0; adjust TA or PD to achieve a
TJ = +225°C minimum.
4.4.2.2 Group B inspection, (JAN, JANTX, and JANTXV). Separate samples may be used for each step. In the
event of a group B failure, the manufacturer may pull a new sample at double size from either the failed assembly lot
or from another assembly lot from the same wafer lot. If the new assembly lot option is exercised, the failed assembly
lot shall be scrapped.
Step
Method
Conditions
Steady-state life: 1,000 hours minimum, VCB = 10 V dc, power shall be applied to achieve
1
1026
TJ = +150°C minimum using a minimum of PD = 75 percent of maximum rated PT as defined
in 1.3. n = 45 devices, c = 0. The sample size may be increased and the test time
decreased as long as the devices are stressed for a total of 45,000 device hours minimum,
and the actual time of test is at least 340 hours.
Blocking life, TA = +150°C, VCB = 80 percent of rated voltage, 48 hours minimum.
2
1048
n = 45 devices, c = 0.
High-temperature life (non-operating), t = 340 hours, TA = +200°C. n = 22, c = 0.
3
1032
4.4.2.3 Group B sample selection. Samples selected from group B inspection shall meet all of the following
requirements:
a. For JAN, JANTX, and JANTXV samples shall be selected randomly from a minimum of three wafers
(or from each wafer in the lot) from each wafer lot. See MIL-PRF-19500.
b. Shall be chosen from an inspection lot that has been submitted to and passed table I, subgroup 2,
conformance inspection. When the final lead finish is solder or any plating prone to oxidation at high
temperature, the samples for life test (group B for JAN, JANTX, and JANTXV) may be pulled prior to
the application of final lead finish.
4.4.3 Group C inspection. Group C inspection shall be conducted in accordance with the tests and conditions
specified for subgroup testing in table E-VII of MIL-PRF-19500, and 4.4.3.1 (JANS), and 4.4.3.2 (JAN, JANTX, and
JANTXV) herein for group C testing. Electrical measurements (end-points) and delta requirements shall be in
11
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business