MIL-PRF-19500/348F
2.3 Order of precedence. In the event of a conflict between the text of this document and the references cited
herein, the text of this document takes precedence. Nothing in this document, however, supersedes applicable laws
and regulations unless a specific exemption has been obtained.
3. REQUIREMENTS
* 3.1 General. The individual item requirements shall be as specified in MIL-PRF-19500 and as modified herein.
* 3.2 Qualification. Devices furnished under this specification shall be products that are manufactured by a
manufacturer authorized by the qualifying activity for listing on the applicable qualified manufacturers list before
contract award (see 4.2 and 6.3).
3.3 Abbreviations, symbols, and definitions. Abbreviations, symbols, and definitions used herein shall be as
specified in MIL-PRF-19500.
* 3.4 Interface and physical dimensions. The interface and physical dimensions shall be as specified in
MIL-PRF-19500, and on figure 1.
* 3.4.1 Lead finish. Lead finish shall be solderable as defined in MIL-PRF-19500. Where a choice of lead finish is
desired, it shall be specified in the acquisition document (see 6.2).
3.5 Electrical performance characteristics. Unless otherwise specified herein, the electrical performance
characteristics are as specified in 1.3, 1.4, and table I.
3.6 Electrical test requirements. The electrical test requirements shall be the subgroups specified in table I herein.
3.7 Marking. Marking shall be in accordance with MIL-PRF-19500.
* 3.8 Workmanship. Semiconductor devices shall be processed in such a manner as to be uniform in quality and
shall be free from other defects that will affect life, serviceability, or appearance.
4. VERIFICATION
4.1 Classification of inspections. The inspection requirements specified herein are classified as follows:
a. Qualification inspection (see 4.2).
b. Screening (see 4.3).
* c. Conformance inspection (see 4.4).
4.2 Qualification inspection. Qualification inspection shall be in accordance with MIL-PRF-19500, and as specified
herein.
* 4.2.1 Group E qualification. Group E inspection shall be performed for qualification or re-qualification only. In case
qualification was awarded to a prior revision of the specification sheet that did not request the performance of table II
tests, the tests specified in table II herein that were not performed in the prior revision shall be performed on the first
inspection lot of this revision to maintain qualification.
4
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business