MIL-PRF-19500/349J
4.4.2.3 Group B sample selection. Samples selected from group B inspection shall meet all of the following
requirements:
a.
Samples shall be selected from each wafer from a die fabrication line that the manufacturer chooses to
certify for the die design used in products manufactured to this specification.
b.
Shall be chosen from an inspection lot that has been submitted to and passed group A conformance
inspection. When the final lead finish is solder or any plating prone to oxidation at high temperature, the
samples for life test (subgroups B3 and B5 for JANS, and group B for JAN, JANTX, and JANTXV) may be
pulled prior to the application of final lead finish.
4.4.3 Group C inspection, Group C inspection shall be conducted in accordance with the conditions specified for
subgroup testing in table E-VII of MIL-PRF-19500, and in 4.4.3.1 (JANS) and 4.4.3.2 (JAN, JANTX, and JANTXV)
herein for group C testing. Electrical measurements (end-points) shall be in accordance with table I, subgroup 2
herein.
4.4.3.1 Group C inspection, table E-VII (JANS) of MIL-PRF-19500.
Subgroup
Method
Condition
C2
2036
Test condition E, not applicable for U4 devices.
C5
3131
C6
1026
Steady-state life: 1,000 hours, VCB = 10 V dc, power shall be applied to achieve
TJ = +150°C minimum using a minimum of PD = 75 percent of maximum rated PT as
defined in 1.3. n = 45 devices, c = 0. The sample size may be increased and the test time
decreased as long as the devices are stressed for a total of 45,000 device hours minimum,
and the actual time of test is at least 340 hours.
4.4.3.2 Group C inspection, table E-VII (JAN, JANTX, and JANTXV) of MIL-PRF-19500.
Subgroup
Method
Condition
C2
2036
Test condition E, not applicable for U4 devices.
C5
3131
C6
Not applicable.
4.4.3.3 Group C sample selection. Samples for subgroups in group C shall be chosen at random from any
inspection lot containing the intended package type and lead finish procured to the same specification which is
submitted to and passes group A tests for conformance inspection. Testing of a subgroup using a single device type
enclosed in the intended package type shall be considered as complying with the requirements for that subgroup.
4.4.4 Group D inspection. Conformance inspection for hardness assured JANS and JANKC types shall include
the group D tests specified in table II herein. These tests shall be performed as required in accordance with
MIL-PRF-19500 and method 1019 of MIL-STD-750, for total ionizing dose or method 1017 of MIL-STD-750 for
neutron fluence as applicable (see 6.2.e herein), except group D, subgroup 2 may be performed separate from other
subgroups. Group D inspection may also be performed ahead of the screening lot using die selected in accordance
with MIL-PRF-19500 and related documents. Alternate package options may also be substituted for the testing
provided there is no adverse effect to the fluence profile.
9
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business