MIL-PRF-19500/391N
4.4.5 Group E inspection. Group E inspection shall be conducted in accordance with the conditions specified for
subgroup testing in table E-IX of MILPRF19500 as specified in table III herein. Electrical measurements (end-
points) shall be in accordance with table I, subgroup 2 herein.
4.5 Method of inspection. Methods of inspection shall be as specified in the appropriate tables and as follows:
4.5.1 Pulse measurements. Conditions for pulse measurement shall be as specified in section 4 of
4.5.2 Collector-base time constant. This parameter may be determined by applying an rf signal voltage of 1.0 volt
(rms) across the collector-base terminals, and measuring the ac voltage drop (Veb ) with a high- impedance rf
voltmeter across the emitter-base terminals. With f = 79.8 MHz used for the 1.0 volt signal, the following computation
applies:
r'b , Cc(ps) = 2 X Veb (millivolts)
15
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business