MIL-PRF-19500/476F
4.4.2.1 Group B inspection, table E-VIB (JAN, JANTX, and JANTXV of MIL-PRF-19500).
Subgroup Method
Condition
VGS = 24 V dc; TA = +125°C; VDS = 0.
B3
1027
TA = +175°C.
B6
1032
4.4.3 Group C inspection. Group C inspection shall be conducted in accordance with the conditions specified for
subgroup testing in table E-VII of MIL-PRF-19500, and as follows. Electrical measurements (end-points) shall be in
accordance with table I, subgroup 2 herein.
Subgroup Method
Condition
C2
1056
Thermal shock: Test condition C, time at temperature extremes = 15 minutes minimum.
C2
2036
Lead fatigue: Test condition E (not applicable to UB suffix devices.)
VGS = 24 V dc; TA = +125°C; VDS = 0.
C6
1026
4.4.4 Group E inspection. Group E inspection shall be conducted in accordance with the conditions specified for
subgroup testing in table E-IX of MIL-PRF-19500 and as specified in table II herein. Electrical measurements (end-
points) shall be in accordance with table I, subgroup 2 herein.
4.5 Methods of inspection. Methods of inspection shall be as specified in the appropriate tables and as follows.
4.5.1 Pulse measurements. Conditions for pulse measurement shall be as specified in section 4 of MIL-STD-750.
7
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business