MIL-PRF-19500/547D
* 4.4.3 Group C inspection. Group C inspection shall be conducted in accordance with the conditions specified for
subgroup testing in table E-VII of MIL-PRF-19500 and as follows. Electrical measurements (end-points) shall be in
accordance with table I, subgroup 2 herein.
Subgroup
Method
Condition
C2
2036
Test condition E .
Thermal resistance, see 4.5.2, RθJC(max) = 20°C/W.
C5
3161
*
C6
1042
Intermittent operation life, condition D, 6,000 cycles . No heat sink or forced air
cooling on the device shall be permitted during the on cycle;
ton = 30 seconds minimum.
4.4.4 Group E inspection. Group E inspection shall be conducted in accordance with the conditions specified for
subgroup testing in table E-IX of MIL-PRF-19500 and as specified in table II herein. Electrical measurements (end-
points) shall be in accordance with table I, subgroup 2 herein.
4.5 Methods of inspection. Methods of inspection shall be as specified in the appropriate tables and as follows.
4.5.1 Pulse measurements. Conditions for pulse measurement shall be as specified in section 4 of MIL-STD-750.
4.5.2 Thermal resistance. The thermal resistance measurements shall be performed in accordance with method
3161 of MIL-STD-750 using the guidelines in that method for determining IM, IH, tH, tSW (and VH where appropriate).
9
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business