MIL-PRF-19500/559K
4.4.3 Group C inspection. Group C inspection shall be conducted in accordance with the conditions specified for
subgroup testing in table E-VII of MIL-PRF-19500, and in 4.4.3.1 (JANS) and 4.4.3.2 (JAN, JANTX, and JANTXV)
herein for group C testing. Electrical measurements (end-points) and delta requirements shall be in accordance with
table I, subgroup 2 and 4.5.5 herein, delta parameters apply to subgroup C6.
4.4.3.1 Group C inspection, table E-VII (JANS) of MIL-PRF-19500.
Subgroup
Method
Condition
C2
2036
Test condition E, 3 ounce weight; three bends of 15 degrees for 2N6990; three bends for
2N6989; not applicable to 2N6989U.
1,000 hours at VCB = 10 V dc; TJ = +150°C min.
C6
1026
4.4.3.2 Group C inspection, table E-VII (JAN, JANTX, and JANTXV) of MIL-PRF-19500.
Method
Condition
Subgroup
C2
2036
Test condition E, 3 ounce weight; three bends of 15 degrees for 2N6990; three bends
for 2N6989; not applicable to 2N6989U.
RθJA, see 1.3.
C5
3131
C6
Not applicable.
4.4.3.3 Group C sample selection. Samples for subgroups in group C shall be chosen at random from any
inspection lot containing the intended package type and lead finish procured to the same specification which is
submitted to and passes group A tests for conformance inspection. Testing of a subgroup using a single device type
enclosed in the intended package type shall be considered as complying with the requirements for that subgroup.
* 4.4.4 Group D inspection. Conformance inspection for hardness assured JANS and JANTXV types shall include
the group D tests specified in table II herein. These tests shall be performed as required in accordance with
MIL-PRF-19500 and method 1019 of MIL-STD-750, for total ionizing dose or method 1017 of MIL-STD-750 for
neutron fluence as applicable (see 6.2.e herein), except group D, subgroup 2 may be performed separate from other
subgroups. Group D inspection may also be performed ahead of the screening lot using die selected in accordance
with MIL-PRF-19500 and related documents. Alternate package options may also be substituted for the testing
provided there is no adverse effect to the fluence profile.
4.4.5 Group E inspection. Group E inspection shall be conducted in accordance with the conditions specified for
subgroup testing in appendix E, table E-IX of MIL-PRF-19500 and as specified table III herein. Electrical
measurements (end-points) and delta measurements shall be in accordance with the applicable steps of table I,
subgroup 2 and 4.5.5 herein.
4.5 Method of inspection. Methods of inspection shall be as specified in the appropriate tables and as follows.
4.5.1 Pulse measurements. Conditions for pulse measurement shall be as specified in section 4 of
MIL-STD-750.
4.5.2 Input capacitance. This test shall be conducted in accordance with method 3240 of MIL-STD-750, except
the output capacitor shall be omitted.
4.5.3 Independent transistor inspections. Inspections shall be performed on each transistor in the array.
4.5.4 Transistor-to-transistor resistance. The leads of each transistor shall be shorted together for this test. The
resistance shall be measured between each transistor in the array.
13
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business