MILPRF19500/581C
TABLE II. Group E inspection (all quality levels) for qualification only.
Qualification
Inspection
sample plan
Method
Conditions
Subgroup 1
45 devices
c=0
Temperature cycling
1051
Test condition C, 500 cycles.
(air to air)
Hermetic seal
1071
Fine leak
Gross leak
Electrical measurements
Subgroup 2
45 devices
c=0
VCB = 10 V dc, 6,000 cycles, forced air cooling
Intermittent life
1037
allowed on cooling cycle only.
Electrical measurements
Sample size
Subgroup 4
N/A
Thermal impedance curves
See MILPRF19500.
Subgroup 5
Not applicable
45 devices
Subgroup 8
c=0
Reverse voltage leakage
1033
Condition B for devices < 400 V.
stability
11
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business