MIL-PRF-19500/606B
* 4.4.2.1 Group B inspection, table VIa (JANS) of MIL-PRF-19500.
Method
Conditions
Subgroup
*
B3
2077
SEM
VDS = rated; TA = +175°C; t = 240 hours min. Read and record VBR(DSS) (pre and
*
B5
1042
post) at ID = 1 mA. Read and record IDSS (pre and post) in accordance with table
IV.
Condition B, VGS = rated; TA = +175°C, t = 24 hours.
B5
1042
B5
2037
Test condition A, all internal wires for each device shall be pulled separately.
B5
3161
See 4.5.2.
* 4.4.2.2 Group B inspection, table VIb (JANTXV) of MIL-PRF-19500.
Method
Conditions
Subgroup
B2
1051
Test condition G, 25 cycles.
4.4.3 Group C inspection. Group C inspection shall be conducted in accordance with the conditions specified for
subgroup testing in appendix E, table VII of MIL-PRF-19500, and herein. Electrical measurements (end-points) and
delta requirements shall be in accordance with the applicable steps of table IV herein.
Method
Conditions
Subgroup
C2
1056
Condition B.
C2
2036
Test condition A, weight = 10 pounds; t = 15 s.
*
C5
3161
See 4.5.2.
C6
1042
Test condition D, 6,000 cycles; a cycle shall be 30 seconds minimum.
4.4.4 Group D Inspection. Group D inspection shall be conducted in accordance with appendix E, table VIII of
MIL-PRF-19500 and table II herein.
* 4.4.5 Group E inspection. Group E inspection shall be conducted in accordance with the conditions specified for
subgroup testing in table IX of MIL-PRF-19500 and as specified in table III herein. Electrical measurements (end-
points) shall be in accordance with table I, subgroup 2 herein.
8
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business