MIL-PRF-19500/608D
4.4.4 Group E inspection. Group E inspection shall be conducted in accordance with the tests and conditions
specified for subgroup testing in table E-IX of MIL-PRF-19500, and table III herein. Electrical measurements (end-
points) shall be in accordance with table I, subgroup 2 herein.
4.5 Methods of inspection. Methods of inspection shall be as specified in appropriate tables and as follows.
4.5.1 Pulse measurements. Conditions for pulse measurements shall be as specified in section 4 of
MIL-STD-750.
6
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business