MIL-PRF-19500/435M
4.4 Conformance inspection. Conformance inspection shall be in accordance with MIL-PRF-19500, and as
specified herein.
4.4.1 Group A inspection. Group A inspection shall be conducted in accordance with appendix E, table E-V of
MIL-PRF-19500. End-point electrical measurements shall be in accordance with table I, subgroup 2 herein.
4.4.2 Group B inspection. Group B inspection shall be conducted in accordance with the conditions specified for
subgroup testing in appendix E, table E-VIa (JANS) and table E-VIb (JAN, JANTX, and JANTXV) of MIL-PRF-19500
and herein. Electrical measurements (end-points) requirements shall be in accordance with table I, subgroup 2
herein.
4.4.2.1 Group B inspection, appendix E, table E-VIa (JANS) of MIL-PRF-19500.
Subgroup
Method
Condition
B3
2101
Decap analysis scribe and break only.
B4
1037
2,000 cycles
B5
1027
IZM = column 10 of table III minimum for 1,000 hours; adjust IZ or TA to achieve
TJ = +175°C minimum. Marking legibility requirements shall not apply.
RθJEC = 100°C/W (max) at zero lead length (DO-213AA), +25°C ≤ TR ≤ +35°C
*
B6
3101 or
4081
RθJEC only.
4.4.2.2 Group B inspection, appendix E, table E-VIb (JAN, JANTX, JANTXV) of MIL-PRF-19500.
Subgroup
Method
Condition
0°C to +100°C, 10 cycles.
B2
1056
-55°C to +175°C, 25 cycles.
B2
1051
B3
1027
IZM = column 10 of table III herein minimum. Adjust IZ or TA to ensure a
TJ = +150°C (min).
B4
2101
Decap analysis scribe and break only.
B5
Not applicable.
TA = +175°C.
B6
1032
11
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business