MIL-PRF-19500/453F
4.4.3 Group C inspection, Group C inspection shall be conducted in accordance with the tests and conditions
specified for subgroup testing in table E-VII of MIL-PRF-19500, and in 4.4.3.1 (JANS) and 4.4.3.2 (JAN, JANTX and
JANTXV) herein for group C testing. Electrical measurements (end-points) shall be in accordance with table I,
subgroup 2 herein.
4.4.3.1 Group C inspection, table E-VII (JANS) of MIL-PRF-19500.
Subgroup
Method
Condition
C2
2036
Test condition E, (not applicable to 2N5109UB).
See 4.3.2, RθJC = 60°C/W.
C5
3131
1,000 hours at VCB = 10 V dc; power shall be applied to achieve TJ = +150°C minimum and
C6
1026
a power dissipation of PD ≥ 75 percent of max rated PT as defined in 1.3 herein shall be
applied. n = 45 devices, c = 0. For small lots, n = 12 devices, c = 0. The sample size may
be increased and the test time decreased so long as the devices are stressed for a total of
45,000 device hours minimum, and the actual time of test is at least 340 hours.
4.4.3.2 Group C inspection, table E-VII (JAN, JANTX, and JANTXV) of MIL-PRF-19500.
Method
Condition
Subgroup
C2
2036
Test condition E (not applicable to 2N5109UB).
See 4.3.2, RθJC = 60°C/W.
C5
3131
C6
Not applicable.
4.4.3.3 Group C sample selection. Samples for subgroups in group C shall be chosen at random from any
inspection lot containing the intended package type and lead finish procured to the same specification which is
submitted to and passes group A tests for conformance inspection. When the final lead finish is solder or any plating
prone to oxidation at high temperature, the samples for C6 life test may be pulled prior to the application of final lead
finish. Testing of a subgroup using a single device type enclosed in the intended package type shall be considered
as complying with the requirements for that subgroup.
* 4.4.4 Group D inspection. Conformance inspection for hardness assured JANS and JANKC types shall include
the group D tests specified in table II herein. These tests shall be performed as required in accordance with
MIL-PRF-19500 and method 1019 of MIL-STD-750, for total ionizing dose or method 1017 of MIL-STD-750 for
neutron fluence as applicable (see 6.2.e herein), except group D, subgroup 2 may be performed separate from other
subgroups. Group D inspection may also be performed ahead of the screening lot using die selected in accordance
with MIL-PRF-19500 and related documents. Alternate package options may also be substituted for the testing
provided there is no adverse effect to the fluence profile.
* 4.4.5 Group E inspection. Group E inspection shall be performed in accordance with table III herein for
qualification or re-qualification only. In case qualification was awarded to a prior revision of the specification that did
not request the performance of table III tests, the tests specified in table III herein must be performed to maintain
qualification.
4.5 Methods of inspection. Methods of inspection shall be as specified in the appropriate tables and as follows.
4.5.1 Pulse measurements. Conditions for pulse measurement shall be as specified in section 4 of MIL-STD-750.
9
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business