MIL-PRF-19500/565E
* TABLE I. Group A inspection - Continued.
Inspection 1/
MIL-STD-750
Symbol
Limits
Unit
Conditions
Min
Max
Method
Subgroup 7 - Continued.
Test 2
Qgs
Gate to source charge
2N6895
0.4
1.2
nC
2N6896
1.1
5.5
nC
2N6897
3
13
nC
2N6898
6
25
nC
Test 3
Qgd
Gate to drain charge
2N6895
0.9
2.9
nC
2N6896
5.5
14.5
nC
2N6897
14
36
nC
2N6898
26
69
nC
VDD = ≤ 30 V; di/dt =100A/μs
Reverse recovery time
3473
trr
IF = 4 A
2N6895
340
ns
2N6896
375
ns
2N6897
500
ns
2N6898
750
ns
1/
For sampling plan, see MIL-PRF-19500.
2/
This test required for the following end-point measurements only:
Group B, subgroups 2 and 3 (JANTXV).
Group B, subgroups 3 and 4 (JANS).
Group C, subgroup 2 and 6.
Group E, subgroup 1.
13
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business