MIL-PRF-19500/603J
4.4.4 Group D Inspection. Group D inspection shall be conducted in accordance with appendix E, table VIII of
MIL-PRF-19500 and table II herein.
4.4.5 Group E inspection. Group E inspection shall be conducted in accordance with the conditions specified for
subgroup testing in table IX of MIL-PRF-19500 and as specified in table III herein. Electrical measurements (end-
points) shall be in accordance with table I, subgroup 2 herein.
4.5 Methods of inspection. Methods of inspection shall be as specified in the appropriate tables and as follows.
4.5.1 Pulse measurements. Conditions for pulse measurement shall be as specified in MIL-STD-750.
11
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business