MIL-PRF-19500/159P
4.4.2.2 Group B inspection, table E-VIb (JAN, JANTX, and JANTXV) of MIL-PRF-19500.
Method
Conditions
Subgroup
B1
2026
As specified.
B1
1022
As specified.
B2
1056
Test Condition A, 25 cycles.
B2
4066
Not applicable.
B2
1071
Test condition E.
B3
1027
See 4.3.1.
B4
2075
As specified.
B5
Not applicable.
B6
1032
As specified.
4.4.3 Group C inspection. Group C inspection shall be conducted in accordance with the conditions specified for
subgroup testing in table E-VII of MIL-PRF-19500. Electrical measurements (end-points) requirements shall be in
accordance with the applicable steps of table I, subgroup 2 herein.
4.4.3.1 Group C inspection, table E-VII of MIL-PRF-19500.
Method
Conditions
Subgroup
C1
2066
As specified.
C2
1056
Test Condition A, 25 cycles.
Lead tension: Test condition A; 4 pounds weight, t = 15 3 seconds. Lead
C2
2036
fatigue: Test condition E (lead tension and fatigue tests are not applicable to
surface mount "UR" version device).
C2
1071
Test condition E.
C2
1021
Omit initial conditioning.
C3
Not applicable.
C4
1041
As specified.
C5
Not applicable.
IZ = 7.5 mA dc, TA = +100C minimum. (see 4.5.2).
C6
1026
C7
Not applicable.
11
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business