MIL-PRF-19500/159P
TABLE II. Group D inspection.
VZ1
JANTXV and
JANTXV and
MIL-STD-750
JANS
JANS
Pre-post
Post-irradiation
Pre-irradiation
Inspection
Unit
Symbol
limits
limits
1/ 2/
IRRAD change
M, D, L, R,
M, D, L, R,
F, G, and H
F, G, and H
Method
Conditions
Min
Max
Min
Max
Min
Max
Subgroup 1
Not applicable
Subgroup 2
TC = +25C
Steady-state
1019
IZ = 7.5 mA dc
total dose
Condition A
irradiation
Reference
4022
5.89
6.51
5.89
6.51
V dc
VZ
IZ = 7.5 mA dc
voltage
0.01 mA dc
(see 4.5.3)
Small-signal
4051
15
15
ohms
ZZ
IZ = 7.5 mA dc
breakdown
Istg = 0.75 ac
Impedance
A
Reverse current
4016
2.0
2.0
IR
DC method;
leakage
VR = 3.0 V dc
VZ
Voltage stability
4022
IZ = 7.5 mA dc
(see 4.5.3)
0.01 mA dc
TA = 25C 2C
3.0
1N821-1,
mV
1N821UR-1
3.0
1N823-1,
mV
1N823UR-1
2.0
1N825-1,
mV
1N825UR-1
1.5
1N827-1,
mV
1N827UR-1
1.0
1N829-1,
mV
1N829UR-1
1/ For sampling plan, see MIL-PRF-19500.
2/ Group D qualification may be performed any time prior to lot formation.
14
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business