MIL-PRF-19500/477K
4.4 Conformance inspection. Conformance inspection shall be in accordance with MIL-PRF-19500 and as
specified herein.
4.4.1 Group A inspection. Group A inspection shall be conducted in accordance with MIL-PRF-19500, and table I
herein. The ZθJX end-point shall be derived by the supplier and approved by the qualifying activity. This ZθJX end-
point shall also be documented in the qualification report.
4.4.2 Group B inspection. Group B inspection shall be conducted in accordance with the tests and conditions
specified for subgroup testing in appendix E, table E-VIa (JANS) and table E-VIb (JAN, JANTX, and JANTXV) of
MIL-PRF-19500 and herein. Electrical measurements (end-points) shall be in accordance with table I, subgroup 2
herein. See table III herein for delta limits when applicable.
4.4.2.1 Group B inspection, appendix E, table VIA (JANS) of MIL-PRF-19500.
Subgroup
Method
Condition
B3
4066
B4
1037
and 4.5.3.1); 2,000 cycles.
B5
1027
45, c = 0; t = 1,000 hours; f = 50 - 60 Hz. TA = 55°C max. For irradiated
devices, include trr as an end-point measurement.
Peak reverse power: For 1N5802 - 1N5806, PRM ≥ 318 W for square wave
B8
4065
in accordance with TM 4065 (PRM ≥ 500 W for half sine-wave). For 1N5807
- 1N5811, PRM ≥ 636 W for square wave in accordance with TM 4065
(PRM ≥ 1,000 W for half sine-wave). Test shall be performed on each sublot;
sampling plan: n = 10, c = 0, electrical end-points, see table I, subgroup 2
herein.
4.4.2.2 Group B inspection, appendix E, table E-VIB (JAN, JANTX, and JANTXV of MIL-PRF-19500).
Subgroup
Method
Condition
B3
1027
end-point measurement.
11
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business