MIL-PRF-19500/563G
* 4.4.2.2 Group B inspection, table E-VIB (JAN, JANTX, and JANTXV) of MIL-PRF-19500.
Subgroup
Method
Condition
B2
1051
Test condition G, 25 cycles.
B3
1042
Test condition D, 2,000 cycles. The heating cycle shall be 1 minute minimum.
*
B3
2037
Test condition D. All internal bond wires for each device shall be pulled separately.
* 4.4.3 Group C inspection. Group C inspection shall be conducted in accordance with the conditions specified for
subgroup testing in table E-VII of MIL-PRF-19500 and as follows. Electrical measurements (end-points) shall be in
accordance with the inspections of table I, subgroup 2 herein.
Subgroup
Method
Condition
C2
2036
Test condition E (not required for LCC).
Thermal resistance, see 4.3.4, RθJC(max) = 2.69°C/W.
*
C5
3161
C6
1042
Test condition D, 6,000 cycles. The heating cycle shall be 1 minute minimum.
4.4.4 Group E inspection. Group E inspection shall be conducted in accordance with the conditions specified for
subgroup testing in table E-IX of MIL-PRF-19500 and as specified in table II herein. Electrical measurements (end-
points) shall be in accordance with table I, subgroup 2 herein.
4.5 Methods of inspection. Methods of inspection shall be as specified in the appropriate tables and as follows.
4.5.1 Pulse measurements. Conditions for pulse measurement shall be as specified in section 4 of MIL-STD-750.
11
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business