MIL-PRF-19500/610F
4.4.2.2 Group B inspection, table E-VIB (JAN, JANTX, JANTXV of MIL-PRF-19500).
Subgroup
Method
Condition
-55°C to 100°C, 10 cycles, n = 22, c = 0.
B2
1056
-55°C to 150°C, 25 cycles, n = 22, c = 0.
1051
IFSM = 5 A(pk), condition A 2, IO = 200 mA; TA = room ambient as
B2
4066
of 8.3 ms each at 1 minute intervals.
IF = 200 mA dc minimum, adjust IF or TA to achieve TJ = + 125°C
B3
1027
minimum.
B4
2075
As specified.
4.4.3 Group C inspection. Group C inspection shall be conducted in accordance with the conditions specified for
subgroup testing in table E-VII of MIL-PRF-19500. Electrical measurements (end-points) shall be in accordance with
the applicable inspections of table I, subgroup 2 herein.
4.4.3.1 Group C inspection, table E-VII of MIL-PRF-19500.
Subgroup
Method
Condition
C2
2036
Tension: Test condition A; weight = 10 pounds; t = 15 s. Lead fatigue:
Test condition E; weight 1 pound. NOTE: Both tension and lead fatigue
are not applicable for UR devices.
C5
3101
See 4.4.5 herein.
IF = 200 mA dc minimum, adjust IF or TA to achieve TJ = + 125°C
C6
1027
minimum.
4.4.4 Group E inspection. Group E inspection shall be conducted in accordance with table E-IX of MIL-PRF-19500
and the conditions for subgroup testing in table II herein. Electrical measurements (end-points) shall be in
accordance with the applicable inspections of table I, subgroup 2 herein.
9
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business