MIL�PRF�19500/598C
TABLE II. Group A, B, C, and E electrical end-point measurements � Continued.
3/
The electrical measurements for group C, shall be as follows:
measurements of steps 1, 2, 3, 4, 5, 6 and 7 shall also be taken.
measurements of step 1, 2, 3, 4, 5 and 6 shall also be taken.
c. In addition to the measurements specified for subgroup 6 of table E�VII of MIL�PRF�19500, the steady
state gate stress measurements of step 1, 2, 3, 4, 5 and 6 shall also be taken.
d. In addition to the measurements specified for subgroup 6 of table E�VII of MIL�PRF�19500, the steady
state reverse bias measurements of step 1, 2, 3, 4, 5 and 6 shall also be taken.
4/
The electrical measurements for group E, all quality levels, shall be as follows:
measurements of steps 1, 2, 3, 4, 5, 6 and 7 shall also be taken.
measurements of steps 1, 2, 3, 4, 5 and 6 shall also be taken.
Devices which exceed the table I (group A) limits for this test shall not be acceptable.
5/
14
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business