MIL�PRF�19500/598C
4.4.2 Group B inspection. Group B inspection shall be conducted in accordance with the conditions specified for
subgroup testing in table E�VIA (JANS) and table E�VIB (JAN, JANTX, and JANTXV) of
MIL�PRF�19500, and herein. Electrical measurements (end-points) and delta requirements shall be in accordance
with table II herein.
4.4.2.1 Quality level JANS (table E�VIA of MIL�PRF�19500).
Subgroup
Method
Conditions
B3
1051
Condition G.
B3
2077
As specified.
B5
1042
Read and record VBR(DSS) (pre and post) at ID = 1 mA. Read and record
B6
3161
4.4.2.2 Quality levels JAN, JANTX, and JANTXV (table E�VIB of MIL�PRF�19500).
Subgroup
Method
Conditions
B2
1051
Condition G.
B3
1042
Condition D, the heating cycle shall be 1 minute minimum.
4.4.3 Group C inspection. Group C inspection shall be conducted in accordance with the conditions specified for
subgroup testing in table E�VII of MIL�PRF�19500 and as follows herein. Electrical measurements (end-points) delta
requirements shall be in accordance with the applicable steps of table II herein.
Subgroup
Method
Conditions
C2
2036
Condition E: The sampling plan applies to the number of leads tested. A minimum
of three devices shall be tested.
C5
3161
C6
1042
Condition D, the heating cycle shall be 1 minute minimum.
4.4.4 Group E inspection. Group E inspection shall be conducted in accordance with the conditions specified for
subgroup testing in table E�IX of MIL�PRF�19500, and as specified in table III herein. Electrical measurements
(end-points) and delta requirements shall be in accordance with the applicable steps of table II herein.
8
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business