MIL-PRF-19500/601K
4.4.3 Group C inspection. Group C inspection shall be conducted in accordance with the conditions specified for
subgroup testing in table E-VII of MIL-PRF-19500 and as follows. Electrical measurements (end-points) shall be in
accordance with table I, subgroup 2 herein.
Subgroup
Method
Condition
C2
1056
Test condition B.
C2
2036
Test condition E; weight = 8 ounces, 3 arcs of 90 degrees (applicable to
TO-205AF only).
C2
1021
Omit initial conditioning.
C5
3161
C6
1042
Test condition D, 6,000 cycles. The heating cycle shall be 30 seconds
minimum.
4.4.4 Group D Inspection. Group D inspection shall be conducted in accordance with table E-VIII of
MIL-PRF-19500 and table II herein.
4.4.5 Group E inspection. Group E inspection shall be conducted in accordance with the conditions specified for
subgroup testing in table E-IX of MIL-PRF-19500 and as specified in table III herein. Electrical measurements (end-
points) shall be in accordance with table I, subgroup 2 herein.
4.5 Methods of inspection. Methods of inspection shall be as specified in the appropriate tables and as follows.
4.5.1 Pulse measurements. Conditions for pulse measurement shall be as specified in section 4 of MIL-STD-750.
11
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business