MIL-PRF-19500/503H
4.4 Conformance inspection. Conformance inspection shall be in accordance with MIL-PRF-19500 and as
specified herein.
4.4.1 Group A inspection. Group A inspection shall be conducted in accordance with MIL-PRF-19500 and table I
herein.
4.4.2 Group B inspection. Group B inspection shall be conducted in accordance with the conditions specified for
subgroup testing in appendix E, table E-VIB (JAN, JANTX, and JANTXV) of MIL-PRF-19500. Electrical
measurements (end-points) and delta requirements shall be in accordance with the applicable steps of table III
herein.
Subgroup
Method
Condition
Thermal shock, 0°C to +100°C, 10 cycles.
B2
1056
Temperature cycling, -55°C to +175°C, 25 cycles.
B2
1051
*
B2
4066
Condition A, IFSM = rated IFSM (see 1.3); ten surges of 8.3 ms each at 1 minute
B3
1027
4.5.5.1). TJ = 150° minimum.
+25°C ≤ TA ≤ +35°C (recorded before test is performed); RθJL (maximum) (see
B5
4081
col. 8 of 1.3); L = 0 inch (0 mm).
4.4.3 Group C inspection. Group C inspection shall be conducted in accordance with the conditions specified for
subgroup testing in appendix E, table E-VII of MIL-PRF-19500. Electrical measurements (end-points) and delta
requirements shall be in accordance with the applicable steps of table III herein.
4.4.3.1 Group C inspection, appendix E, table E-VII of MIL-PRF-19500.
Subgroup
Method
Condition
Thermal shock, 0°C to +100°C, 15 cycles.
C2
1056
Temperature cycling, -55°C to +175°C, 25 cycles.
C2
1051
C2
2036
Tension test condition A, t = 15s, for 1N6073 through 1N6075, weight = 12
lbs., for 1N6076 through 1N6081, weight = 20 lbs.
+25°C ≤ TA ≤ +35°C (recorded before test is performed); RθJL (maximum)
C5
4081
(see col. 8 of 1.3); L = 0 inch (0 mm).
C6
1027
7
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business