MIL-PRF-19500/595K
4.3.1 Screening (JANHC and JANKC). Screening of die shall be in accordance with appendix G of
MIL-PRF-19500. As a minimum, die shall be 100 percent probed in accordance with table I, subgroup 2, except test
current shall not exceed 20 A.
4.3.2 Gate stress test. Apply VGS = 30 V minimum for t = 250 s minimum.
4.3.3 Single pulse avalanche energy (EAS).
a. Peak current (ID) ............................................. IAR(max).
b. Peak gate voltage (VGS).................................. -10 V.
c. Gate to source resistor (RGS) .......................... 25 RGS 200 .
d. Initial case temperature .................................. +25C +10C, -5C.
e. Inductance ...................................................... 2 E AS VBR VDD mH minimum.
I D1
2
VBR
f. Number of pulses to be applied ....................... 1 pulse minimum.
g. Supply voltage (VDD) ....................................... 25 V for 2N7236, 2N7236U, -50 V for 2N7237, 2N7237U.
4.3.4 Thermal impedance. The thermal impedance measurements shall be performed in accordance with method
3161 of MIL-STD-750 using the guidelines in that method for determining IM, IH, tH, tSW, (and VH where appropriate).
Measurement delay time (tMD) = 60 s max. See table II, group E, subgroup 4 herein.
*
4.3.5 Dielectric withstanding voltage.
a. Magnititude of test voltage...................................900 V dc.
b. Duration of application of test voltage....................15 seconds (min).
c. Points of application of test voltage........................All leads to case (bunch connection).
d. Method of connection.........................................Mechanical.
e. Kilovolt-ampere rating of high voltage source..........1,200 V/1.0 mA (min).
f. Maximum leakage current....................................1.0 mA.
g. Voltage ramp up time...................................................500 V/second.
4.4 Conformance inspection. Conformance inspection shall be in accordance with MIL-PRF-19500.
4.4.1 Group A inspection. Group A inspection shall be conducted in accordance with MIL-PRF-19500, and table I
herein. End-point electrical measurements shall be in accordance with table I, subgroup 2 herein.
10
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business