* 4.4.3 Group C inspection. Group C inspection shall be conducted in accordance with the tests and conditions
specified for subgroup testing in table E-VII of MIL-PRF-19500, and in 4.4.3.1 (JANS) and 4.4.3.2 (JAN, JANTX, and
JANTXV) herein for group C testing. Electrical measurements (end-points) shall be in accordance with table I,
subgroup 2 herein.
*
4.4.3.1 Group C inspection (JANS), table E-VII of MIL-PRF-19500.
Subgroup
Method
Condition
C2
2036
Test condition E (not applicable to the 2N720AUB).
C5
3131
C6
1026
1,000 hours at VCB = 10 V dc; power shall be applied to achieve TJ = +150°C minimum and
sample size may be increased and the test time decreased as long as the devices are
stressed for a total of 45,000 device hours minimum, and the actual time of test is at least
340 hours.
*
4.4.3.2 Group C inspection (JAN, JANTX, and JANTXV), table E-VII of MIL-PRF-19500.
Method
Condition
Subgroup
C2
2036
Test condition E (not applicable to the 2N720AUB).
C5
3131
C6
1026
Not applicable.
4.4.3.3 Group C sample selection. Samples selected from group C inspection shall be chosen at random from
any lot containing the intended package type and lead finish procured to the same specification which is submitted to
and passes group A tests for conformance inspection. When the final lead finish is solder or any plating prone to
oxidation at high temperature, the samples for C6 life test may be pulled prior to the application of final lead finish.
Testing of a group using a single device type enclosed in the intended package type shall be considered as
complying with the requirements for that subgroup.
* 4.4.4 Group D inspection. Conformance inspection for hardness assured JANS and JANTXV types shall include
the group D tests specified in table II herein. These tests shall be performed as required in accordance with
MIL-PRF-19500 and method 1019 of MIL-STD-750, for total ionizing dose or method 1017 of MIL-STD-750 for
neutron fluence as applicable (see 6.2.e herein), except group D, subgroup 2 may be performed separate from other
subgroups. Alternate package options may also be substituted for the testing provided there is no adverse effect to
the fluence profile.
* 4.4.5 Group E inspection. Group E inspection shall be conducted in accordance with the conditions specified for
subgroup testing in table E-IX of MIL-PRF-19500 and as specified in table III herein. Electrical measurements (end-
points) shall be in accordance with table I, subgroup 2 herein.
4.5 Method of inspection. Methods of inspection shall be as specified in appropriate tables and as follows.
4.5.1 Pulse measurements. Conditions for pulse measurements shall be as specified in section 4 of
MIL-STD-750.