MIL-PRF-19500/429N
4.4 Conformance inspection. Conformance inspection shall be in accordance with MIL-PRF-19500 and as
specified herein.
4.4.1 Group A inspection. Group A inspection shall be conducted in accordance with MIL-PRF-19500, and table I
herein. The ZθJX end-point shall be derived by the supplier and approved by the qualifying activity. This ZθJX end-
point shall be documented in the qualification report.
4.4.2 Group B inspection. Group B inspection shall be conducted in accordance with the conditions specified for
subgroup testing in appendix E, table E-VIA (JANS) and table E-VIB (JANTX and JANTXV) of MIL-PRF-19500,
appendix E, and as follows. Electrical measurements (end-points) shall be in accordance with table I, subgroup 2
herein. Delta measurements shall be as specified in table III herein.
* 4.4.2.1 Group B inspection, appendix E, table E-VIA (JANS) of MIL-PRF-19500. For B5, if a failure occurs,
resubmission shall be at the test conditions of the original sample.
Subgroup
Method
Condition
0°C to +100°C, 25 cycles.
B3
1056
-55°C to +175°C, 100 cycles.
B3
1051
*
B3
4066
minute intervals, superimposed on IO = 750 mA, VRWM = rated VRWM (see col. 3
B4
1037
and 4.5.3.1); 2,000 cycles.
B5
1027
Temporary leads may be added for surface mount devices. For irradiated
devices, include trr as an end-point measurement.
B8
4065
sine wave). Test shall be performed on each sublot; sampling plan n = 10, c = 0,
end-points, see 4.4.2.
9
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business